NORWOOD RD over MUD CREEK
0.2 S. 1.5 W. DONNELLY · County 085, Idaho · Built 2004 · 2 Lanes · 900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
44.727583, -116.108944
This bridge is in worse condition than 51.6% of bridges in County 085. The average bridge in Idaho is 0 years old; this one is 22 years old.
Nearby Bridges
STC 3938;ROSEBERRY over MUD CREEK
Built 2004
STC 3988;ROSEBERRY over LAKE FORK
Built 1965
SH 55 over BOULDER CREEK
Built 1999
STC 3938;ROSEBERRY over CASCADE RESERVOIR
Built 1975
STC 3988;ROSEBERRY over BOULDER CREEK
Built 1996
STC 3988;ROSEBERRY over WILLOW CREEK
Built 1996
S3944;FARM TO MRKT over WILLOW CREEK
Built 1996
NISULA ROAD over MUD CREEK
Built 1986
SH 55 over GOLD FORK RIVER
Built 2016
SCHELINE LANE over LAKE FORK CREEK
Built 1976
Bridge Details
- Structure #
- 000000000020086
- Year Built
- 2004
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.2 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 900
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $426,000
- Total Project Cost
- $639,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.