STC 3938;ROSEBERRY over MUD CREEK

1.6 W. DONNELLY · County 085, Idaho · Built 2004 · 2 Lanes · 970 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000028568
Year Built
2004
Length
16.5 m (54.1 ft)
Max Span
15.2 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
970
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.