STC 3938;ROSEBERRY over CASCADE RESERVOIR
1.3 S. 2.8 W. DONNELLY · County 085, Idaho · Built 1975 · 2 Lanes · 2,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
44.712297, -116.136558
This bridge is in worse condition than 85.6% of bridges in County 085. The average bridge in Idaho is 0 years old; this one is 51 years old.
Nearby Bridges
NORWOOD RD over MUD CREEK
Built 2004
STC 3938;ROSEBERRY over MUD CREEK
Built 2004
STC 3988;ROSEBERRY over LAKE FORK
Built 1965
SH 55 over BOULDER CREEK
Built 1999
STC 3988;ROSEBERRY over BOULDER CREEK
Built 1996
NO DATA ENTERED over JUNGLE CREEK
Built 1982
SH 55 over GOLD FORK RIVER
Built 2016
NISULA ROAD over MUD CREEK
Built 1986
STC 3988;ROSEBERRY over WILLOW CREEK
Built 1996
S3944;FARM TO MRKT over WILLOW CREEK
Built 1996
Bridge Details
- Structure #
- 000000000020080
- Year Built
- 1975
- Length
- 49.4 m (162.1 ft)
- Max Span
- 23.8 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 2,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.