NISULA ROAD over MUD CREEK
2.0 N. 2.0 W. DONNELLY · County 085, Idaho · Built 1986 · 2 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Culvert
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 4 | Poor |
Location
44.773833, -116.114261
This bridge is in worse condition than 96.1% of bridges in County 085. The average bridge in Idaho is 0 years old; this one is 40 years old.
Nearby Bridges
SCHELINE LANE over LAKE FORK CREEK
Built 1976
SMYLIE LANE over N.FK.PAYETTE RIVER
Built 1977
SH 55 over LAKE FORK CREEK
Built 1985
STC 3938;ROSEBERRY over MUD CREEK
Built 2004
STC 3988;ROSEBERRY over LAKE FORK
Built 1965
NORWOOD RD over MUD CREEK
Built 2004
S3944;FARM TO MRKT over BOULDER CREEK
Built 1996
PADDY FLAT ROAD over BOULDER CREEK
Built 1978
S3944;FARM TO MRKT over STOVER CREEK
Built 1996
STC 3988;ROSEBERRY over BOULDER CREEK
Built 1996
Bridge Details
- Structure #
- 000000000028570
- Year Built
- 1986
- Length
- 12.5 m (41 ft)
- Max Span
- 2.1 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $253,000
- Total Project Cost
- $380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.