SCHELINE LANE over LAKE FORK CREEK

3.0 N. 0.5 W. DONNELLY · County 085, Idaho · Built 1976 · 2 Lanes · 90 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000028595
Year Built
1976
Length
27.7 m (90.9 ft)
Max Span
13.7 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
90
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.