STC 3988;ROSEBERRY over WILLOW CREEK
1.5 E. DONNELLY · County 085, Idaho · Built 1996 · 2 Lanes · 370 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Culvert
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 4 | Poor |
Location
44.731011, -116.048436
This bridge is in worse condition than 96.1% of bridges in County 085. The average bridge in Idaho is 0 years old; this one is 30 years old.
Nearby Bridges
S3944;FARM TO MRKT over WILLOW CREEK
Built 1996
STC 3988;ROSEBERRY over BOULDER CREEK
Built 1996
SH 55 over BOULDER CREEK
Built 1999
S3944;FARM TO MRKT over STOVER CREEK
Built 1996
SH 55 over GOLD FORK RIVER
Built 2016
STC 3988;ROSEBERRY over LAKE FORK
Built 1965
S3944;FARM TO MRKT over BOULDER CREEK
Built 1996
NORWOOD RD over MUD CREEK
Built 2004
PADDY FLAT ROAD over BOULDER CREEK
Built 1978
STC 3938;ROSEBERRY over MUD CREEK
Built 2004
Bridge Details
- Structure #
- 000000000020068
- Year Built
- 1996
- Length
- 9.1 m (29.9 ft)
- Max Span
- 1.8 m
- Width
- 18.6 m (61 ft)
- Lanes
- 2
- Daily Traffic
- 370
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $219,000
- Total Project Cost
- $329,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.