SH 55 over GOLD FORK RIVER

2.0 S DONNELLY · County 085, Idaho · Built 2016 · 2 Lanes · 5,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000014841
Year Built
2016
Length
46.6 m (152.9 ft)
Max Span
46 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
5,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.