SR 35 CONNECTOR over I-75 (EXIT 61)
APP 2 MI W OF TIFTON · County 277, Georgia · Built 1988 · 3 Lanes · 5,540 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.441517, -83.527189
This bridge is in worse condition than 43.8% of bridges in County 277. The average bridge in Georgia is 0 years old; this one is 38 years old.
Nearby Bridges
US 319 over I-75
Built 1987
McCORMICK DRIVE over LITTLE RIVER TRIB
Built 1986
SOUTH RIDGE AVE. over LITTLE RIVER TRIB
Built 1980
YOUMANS STREET over LITTLE RIVER TRIB
Built 1980
I-75 over NFS RAILROAD
Built 1957
I-75 (EXIT 62) over SR 520 (US 82)
Built 1957
US 82 / SR 520 CO over LITTLE RIVER TRIB
Built 1956
I-75 over CSX RR (TRACKS REMOVED)
Built 1957
I-75 over FAS 1979 S CENTRAL AVE
Built 1957
2ND STREET over I-75 (EXIT 63A)
Built 1987
Bridge Details
- Structure #
- 000000027700820
- Year Built
- 1988
- Length
- 89.3 m (293 ft)
- Max Span
- 34.1 m
- Width
- 19.8 m (65 ft)
- Lanes
- 3
- Daily Traffic
- 5,540
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,457,000
- Total Project Cost
- $2,186,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.