I-75 (EXIT 62) over SR 520 (US 82)

APP 2 MI W OF TIFTON · County 277, Georgia · Built 1957 · 8 Lanes · 60,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027700310
Year Built
1957
Reconstructed
2005
Length
48.8 m (160.1 ft)
Max Span
12.8 m
Width
46.4 m (152.2 ft)
Lanes
8
Daily Traffic
60,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,648,000
Total Project Cost
$2,472,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.