US 319 over I-75

APP 2 MI W OF TIFTON · County 277, Georgia · Built 1987 · 4 Lanes · 6,820 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000027700780
Year Built
1987
Length
91.4 m (299.9 ft)
Max Span
45.7 m
Width
16.8 m (55.1 ft)
Lanes
4
Daily Traffic
6,820
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,812,000
Total Project Cost
$2,717,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.