I-75 over NFS RAILROAD

2.5 MI W OF TIFTON · County 277, Georgia · Built 1957 · 8 Lanes · 60,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027700290
Year Built
1957
Reconstructed
2005
Length
59.4 m (194.9 ft)
Max Span
11.9 m
Width
43.4 m (142.4 ft)
Lanes
8
Daily Traffic
60,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,009,000
Total Project Cost
$3,013,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.