I-75 over CSX RR (TRACKS REMOVED)

APP 2 MI W OF TIFTON · County 277, Georgia · Built 1957 · 8 Lanes · 60,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000027700320
Year Built
1957
Reconstructed
1985
Length
45.7 m (149.9 ft)
Max Span
15.2 m
Width
43.6 m (143 ft)
Lanes
8
Daily Traffic
60,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,545,000
Total Project Cost
$2,318,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.