2ND STREET over I-75 (EXIT 63A)

APP 2 MI W OF TIFTON · County 277, Georgia · Built 1987 · 3 Lanes · 6,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027700710
Year Built
1987
Length
67.1 m (220.1 ft)
Max Span
33.5 m
Width
24.4 m (80.1 ft)
Lanes
3
Daily Traffic
6,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,094,000
Total Project Cost
$1,641,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.