I-75 over M-4707- CSX RAILROAD

APP 2 MI N OF TIFTON · County 277, Georgia · Built 1957 · 7 Lanes · 58,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027700340
Year Built
1957
Reconstructed
2005
Length
75 m (246.1 ft)
Max Span
15.5 m
Width
39.6 m (129.9 ft)
Lanes
7
Daily Traffic
58,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,272,000
Total Project Cost
$3,408,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.