I-75 (EXIT 64) over SR 7 (US 41)

APP 3 MI N OF TIFTON · County 277, Georgia · Built 1957 · 6 Lanes · 58,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027700360
Year Built
1957
Reconstructed
2005
Length
70.4 m (231 ft)
Max Span
19.2 m
Width
36.6 m (120.1 ft)
Lanes
6
Daily Traffic
58,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,887,000
Total Project Cost
$2,831,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.