BRIGHTON ROAD over I-75 (EXIT 66)

APP 3 MI N OF TIFTON · County 277, Georgia · Built 2016 · 2 Lanes · 2,101 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000027750840
Year Built
2016
Length
77.4 m (253.9 ft)
Max Span
40.5 m
Width
17.5 m (57.4 ft)
Lanes
2
Daily Traffic
2,101
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$22,570,000
Total Project Cost
$33,855,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.