I-75 over SR 7 (US 341)EXIT136
PERRY - NW SECTION · County 153, Georgia · Built 1962 · 6 Lanes · 67,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.446764, -83.754486
This bridge is in worse condition than 89.3% of bridges in County 153. The average bridge in Georgia is 0 years old; this one is 64 years old.
Nearby Bridges
US 41- SR 127 over I-75 @134.61(EXIT 135)
Built 1963
GAINES DRIVE over I-75 @ 135.17N
Built 1963
I-75 over BIG INDIAN CREEK
Built 1963
SOUTH PERRY PKWY over I-75@ 133.60 (EXIT 134)
Built 1999
US 41- SR 127 over BIG INDIAN CREEK
Built 1931
I-75 over NS RAILROAD
Built 1962
SMITH DRIVE over BAY CREEK
Built 1970
BALL STREET EXT. over BIG INDIAN CREEK
Built 2012
MOSS OAKS ROAD over BIG INDIAN CREEK
Built 2020
I-75 over FLAT CREEK
Built 1963
Bridge Details
- Structure #
- 000000015300520
- Year Built
- 1962
- Reconstructed
- 1993
- Length
- 67.1 m (220.1 ft)
- Max Span
- 20.4 m
- Width
- 42.5 m (139.4 ft)
- Lanes
- 6
- Daily Traffic
- 67,800
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,797,000
- Total Project Cost
- $2,696,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.