US 41- SR 127 over I-75 @134.61(EXIT 135)

PERRY - SW SECTION · County 153, Georgia · Built 1963 · 5 Lanes · 13,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300060
Year Built
1963
Reconstructed
1989
Length
62.2 m (204.1 ft)
Max Span
21.3 m
Width
29 m (95.1 ft)
Lanes
5
Daily Traffic
13,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,449,000
Total Project Cost
$2,174,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.