MOSS OAKS ROAD over BIG INDIAN CREEK
PERRY - WESTSIDE · County 153, Georgia · Built 2020 · 2 Lanes · 260 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
32.455586, -83.779106
This bridge is in worse condition than 33.9% of bridges in County 153. The average bridge in Georgia is 0 years old; this one is 6 years old.
Nearby Bridges
SMITH DRIVE over BAY CREEK
Built 1970
PERRY VET PARKWAY over BAY CREEK
Built 1999
PERRY VET PARKWAY over BAY CREEK
Built 1999
US 41- SR 127 over I-75 @134.61(EXIT 135)
Built 1963
I-75 over SR 7 (US 341)EXIT136
Built 1962
GAINES DRIVE over I-75 @ 135.17N
Built 1963
I-75 over BIG INDIAN CREEK
Built 1963
I-75 over NS RAILROAD
Built 1962
US 341 over BAY CREEK
Built 1994
SOUTH PERRY PKWY over I-75@ 133.60 (EXIT 134)
Built 1999
Bridge Details
- Structure #
- 000000015350540
- Year Built
- 2020
- Length
- 30.5 m (100.1 ft)
- Max Span
- 6.1 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 260
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,880,000
- Total Project Cost
- $13,320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.