I-75 over NS RAILROAD

PERRY - WESTSIDE · County 153, Georgia · Built 1962 · 6 Lanes · 67,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300500
Year Built
1962
Reconstructed
1993
Length
45.4 m (149 ft)
Max Span
17.4 m
Width
42.4 m (139.1 ft)
Lanes
6
Daily Traffic
67,800
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,217,000
Total Project Cost
$1,826,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.