GAINES DRIVE over I-75 @ 135.17N

PERRY - WESTSIDE · County 153, Georgia · Built 1963 · 2 Lanes · 310 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300580
Year Built
1963
Length
76.8 m (252 ft)
Max Span
21.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
310
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$985,000
Total Project Cost
$1,477,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.