SOUTH PERRY PKWY over I-75@ 133.60 (EXIT 134)
SOUTH PERRY · County 153, Georgia · Built 1999 · 5 Lanes · 2,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.431594, -83.75695
This bridge is in worse condition than 39.3% of bridges in County 153. The average bridge in Georgia is 0 years old; this one is 27 years old.
Nearby Bridges
I-75 over FLAT CREEK
Built 1963
US 41- SR 127 over I-75 @134.61(EXIT 135)
Built 1963
I-75 over SR 7 (US 341)EXIT136
Built 1962
US 41 over FLAT CREEK
Built 1954
ELKO ROAD over FLAT CREEK
Built 2009
GAINES DRIVE over I-75 @ 135.17N
Built 1963
I-75 over BIG INDIAN CREEK
Built 1963
BALL STREET EXT. over BIG INDIAN CREEK
Built 2012
US 41- SR 127 over BIG INDIAN CREEK
Built 1931
MOSS OAKS ROAD over BIG INDIAN CREEK
Built 2020
Bridge Details
- Structure #
- 000000015350310
- Year Built
- 1999
- Length
- 100.9 m (331 ft)
- Max Span
- 31.1 m
- Width
- 35.3 m (115.8 ft)
- Lanes
- 5
- Daily Traffic
- 2,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,351,000
- Total Project Cost
- $3,527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.