SOUTH PERRY PKWY over I-75@ 133.60 (EXIT 134)

SOUTH PERRY · County 153, Georgia · Built 1999 · 5 Lanes · 2,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015350310
Year Built
1999
Length
100.9 m (331 ft)
Max Span
31.1 m
Width
35.3 m (115.8 ft)
Lanes
5
Daily Traffic
2,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,351,000
Total Project Cost
$3,527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.