I-75 over FLAT CREEK

3 MI SW OF PERRY · County 153, Georgia · Built 1963 · 6 Lanes · 57,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300460
Year Built
1963
Reconstructed
2007
Length
39 m (128 ft)
Max Span
9.8 m
Width
42.5 m (139.4 ft)
Lanes
6
Daily Traffic
57,600
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,046,000
Total Project Cost
$1,569,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.