I-75 over FLAT CREEK
3 MI SW OF PERRY · County 153, Georgia · Built 1963 · 6 Lanes · 57,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.418803, -83.761142
This bridge is in worse condition than 39.3% of bridges in County 153. The average bridge in Georgia is 0 years old; this one is 63 years old.
Nearby Bridges
US 41 over FLAT CREEK
Built 1954
SOUTH PERRY PKWY over I-75@ 133.60 (EXIT 134)
Built 1999
ELKO ROAD over FLAT CREEK
Built 2009
US 41- SR 127 over I-75 @134.61(EXIT 135)
Built 1963
I-75 over SR 7 (US 341)EXIT136
Built 1962
ELKO RD over OKEETUCK CREEK
Built 2008
GAINES DRIVE over I-75 @ 135.17N
Built 1963
FIRETOWER ROAD over [email protected]
Built 1963
LARRY WALKER PKWY over GA SOU & FLA RAILROAD
Built 1994
BALL STREET EXT. over BIG INDIAN CREEK
Built 2012
Bridge Details
- Structure #
- 000000015300460
- Year Built
- 1963
- Reconstructed
- 2007
- Length
- 39 m (128 ft)
- Max Span
- 9.8 m
- Width
- 42.5 m (139.4 ft)
- Lanes
- 6
- Daily Traffic
- 57,600
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,046,000
- Total Project Cost
- $1,569,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.