FIRETOWER ROAD over [email protected]
6 MI S OF PERRY · County 153, Georgia · Built 1963 · 2 Lanes · 40 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.382133, -83.767956
This bridge is in worse condition than 89.3% of bridges in County 153. The average bridge in Georgia is 0 years old; this one is 63 years old.
Nearby Bridges
I-75 SBL over SOUTH PRONG CREEK
Built 1963
I-75 NBL over SOUTH PRONG CREEK
Built 1963
US 41 over SOUTH PRONG CREEK
Built 1927
US 41 over FLAT CREEK
Built 1954
ELKO RD over OKEETUCK CREEK
Built 2008
I-75 over FLAT CREEK
Built 1963
SR 26 over [email protected] (EXIT 127)
Built 1963
ELKO ROAD over FLAT CREEK
Built 2009
SOUTH PERRY PKWY over I-75@ 133.60 (EXIT 134)
Built 1999
TOOMER RD over FLAT CRK.
Built 2008
Bridge Details
- Structure #
- 000000015300560
- Year Built
- 1963
- Length
- 87.8 m (288.1 ft)
- Max Span
- 30.2 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,125,000
- Total Project Cost
- $1,688,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.