SR 26 over [email protected] (EXIT 127)

3.5 MI W OF ELKO · County 153, Georgia · Built 1963 · 2 Lanes · 2,460 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300200
Year Built
1963
Length
70.7 m (232 ft)
Max Span
24.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
2,460
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$906,000
Total Project Cost
$1,360,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.