I-75 NBL over SR 7 (US 41)

4 MI SW OF ELKO · County 153, Georgia · Built 1963 · 3 Lanes · 56,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300410
Year Built
1963
Reconstructed
1996
Length
69.2 m (227 ft)
Max Span
30.8 m
Width
21.2 m (69.6 ft)
Lanes
3
Daily Traffic
56,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,129,000
Total Project Cost
$1,693,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.