I-75 SBL over SR 7 (US 41)

4 MI SW OF EKLO · County 153, Georgia · Built 1963 · 3 Lanes · 140,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000015300420
Year Built
1963
Reconstructed
1996
Length
65.5 m (214.9 ft)
Max Span
29 m
Width
20.5 m (67.3 ft)
Lanes
3
Daily Traffic
140,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,069,000
Total Project Cost
$1,604,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.