HF REED IND. PKWY over I-985 (US 23) STREAM 15
1.9 MI SOUTH OF OAKWOOD · County 139, Georgia · Built 2019 · 6 Lanes · 1,594 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
34.202222, -83.893861
This bridge is in worse condition than 55.3% of bridges in County 139. The average bridge in Georgia is 0 years old; this one is 7 years old.
Nearby Bridges
I-985 EXIT RAMP B over MUD CREEK
Built 2019
I-985 EXIT RAMP C over MUD CREEK
Built 2019
HF REED INDUSTRIAL over NORFOLK SOUTHERN
Built 2001
ATLANTA HIGHWAY over SR 419 (I-985 US 23)
Built 1968
PLAINVIEW ROAD over SR 419 (I-985 US 23)
Built 1968
I-985 NBL (US 23) over S-2920 SPOUT SPRINGS RD
Built 1968
I-985 SBL (US 23) over S-2920 SPOUT SPRINGS RD
Built 1968
OLD OAKWOOD RD over BALUS CREEK TRIB
Built 1992
I-985 NB SB AND S over SR 53
Built 2009
MULBERRY STREET over FLOWERY BRANCH
Built 1985
Bridge Details
- Structure #
- 000000013951160
- Year Built
- 2019
- Length
- 151.5 m (497 ft)
- Max Span
- 39.6 m
- Width
- 32.1 m (105.3 ft)
- Lanes
- 6
- Daily Traffic
- 1,594
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $44,104,000
- Total Project Cost
- $66,156,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.