HF REED IND. PKWY over I-985 (US 23) STREAM 15

1.9 MI SOUTH OF OAKWOOD · County 139, Georgia · Built 2019 · 6 Lanes · 1,594 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000013951160
Year Built
2019
Length
151.5 m (497 ft)
Max Span
39.6 m
Width
32.1 m (105.3 ft)
Lanes
6
Daily Traffic
1,594
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$44,104,000
Total Project Cost
$66,156,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.