HF REED INDUSTRIAL over NORFOLK SOUTHERN

CITY OF FLOWERY BRANCH · County 139, Georgia · Built 2001 · 2 Lanes · 13,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000013951000
Year Built
2001
Length
56.4 m (185 ft)
Max Span
26.5 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
13,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$723,000
Total Project Cost
$1,084,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.