I-985 NB SB AND S over SR 53
IN OAK WOOD · County 139, Georgia · Built 2009 · 5 Lanes · 70,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.225514, -83.865647
This bridge is in worse condition than 55.3% of bridges in County 139. The average bridge in Georgia is 0 years old; this one is 17 years old.
Nearby Bridges
STATE ROUTE 53 over RAMP TO 985 NORTH
Built 2007
ATLANTA HIGHWAY over SR 419 (I-985 US 23)
Built 2007
SR 53 over NOR SOUTHERN RAILROAD
Built 1969
PLAINVIEW ROAD over SR 419 (I-985 US 23)
Built 1968
OLD OAKWOOD RD over BALUS CREEK TRIB
Built 1992
TUMBLING CREEK RD over NORFOLK SOUTHERN
Built 2019
MUNDY MILL ROAD over BALUS CREEK
Built 1969
I-985 EXIT RAMP C over MUD CREEK
Built 2019
OLD FLOWERY BRANCH over BALUS CREEK
Built 1994
ELACHEE ROAD over SR 419 (I-985 US 23)
Built 2024
Bridge Details
- Structure #
- 000000013950960
- Year Built
- 2009
- Length
- 75.6 m (248 ft)
- Max Span
- 25.6 m
- Width
- 52.7 m (172.9 ft)
- Lanes
- 5
- Daily Traffic
- 70,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,762,000
- Total Project Cost
- $2,643,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.