PLAINVIEW ROAD over SR 419 (I-985 US 23)
IN OAKWOOD · County 139, Georgia · Built 1968 · 2 Lanes · 5,070 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.215778, -83.881108
This bridge is in worse condition than 79.6% of bridges in County 139. The average bridge in Georgia is 0 years old; this one is 58 years old.
Nearby Bridges
I-985 EXIT RAMP C over MUD CREEK
Built 2019
I-985 NB SB AND S over SR 53
Built 2009
OLD OAKWOOD RD over BALUS CREEK TRIB
Built 1992
HF REED IND. PKWY over I-985 (US 23) STREAM 15
Built 2019
I-985 EXIT RAMP B over MUD CREEK
Built 2019
STATE ROUTE 53 over RAMP TO 985 NORTH
Built 2007
HF REED INDUSTRIAL over NORFOLK SOUTHERN
Built 2001
SR 53 over NOR SOUTHERN RAILROAD
Built 1969
ATLANTA HIGHWAY over SR 419 (I-985 US 23)
Built 2007
ATLANTA HIGHWAY over SR 419 (I-985 US 23)
Built 1968
Bridge Details
- Structure #
- 000000013900560
- Year Built
- 1968
- Length
- 65.8 m (215.9 ft)
- Max Span
- 21.9 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 5,070
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $844,000
- Total Project Cost
- $1,266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.