ATLANTA HIGHWAY over SR 419 (I-985 US 23)
1.4 MI E OF FLOWERY BR · County 139, Georgia · Built 1968 · 2 Lanes · 13,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.192397, -83.902236
This bridge is in worse condition than 79.6% of bridges in County 139. The average bridge in Georgia is 0 years old; this one is 58 years old.
Nearby Bridges
I-985 EXIT RAMP B over MUD CREEK
Built 2019
HF REED IND. PKWY over I-985 (US 23) STREAM 15
Built 2019
I-985 EXIT RAMP C over MUD CREEK
Built 2019
HF REED INDUSTRIAL over NORFOLK SOUTHERN
Built 2001
I-985 NBL (US 23) over S-2920 SPOUT SPRINGS RD
Built 1968
I-985 SBL (US 23) over S-2920 SPOUT SPRINGS RD
Built 1968
MULBERRY STREET over FLOWERY BRANCH
Built 1985
ATLANTA HIGHWAY over FLOWERY BRANCH
Built 1931
PLAINVIEW ROAD over SR 419 (I-985 US 23)
Built 1968
McEVER RD over FLOWERY BRANCH (LAKE)
Built 1961
Bridge Details
- Structure #
- 000000013900090
- Year Built
- 1968
- Length
- 67.1 m (220.1 ft)
- Max Span
- 22.9 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 13,600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $860,000
- Total Project Cost
- $1,289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.