McEVER RD over FLOWERY BRANCH (LAKE)
1.1 MI W OF FLOWERY BR · County 139, Georgia · Built 1961 · 2 Lanes · 10,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
34.186114, -83.943394
This bridge is in worse condition than 79.6% of bridges in County 139. The average bridge in Georgia is 0 years old; this one is 65 years old.
Nearby Bridges
ATLANTA HIGHWAY over FLOWERY BRANCH
Built 1931
MULBERRY STREET over FLOWERY BRANCH
Built 1985
GAINES FERRY RD over NOR SOUTHERN RAILROAD
Built 1988
I-985 SBL (US 23) over S-2920 SPOUT SPRINGS RD
Built 1968
I-985 NBL (US 23) over S-2920 SPOUT SPRINGS RD
Built 1968
WADE ORR ROAD over SR 419 (I-985 US 23)
Built 1968
ATLANTA HIGHWAY over BIG CREEK
Built 1931
ATLANTA HIGHWAY over SR 419 (I-985 US 23)
Built 1968
HF REED INDUSTRIAL over NORFOLK SOUTHERN
Built 2001
I-985 EXIT RAMP B over MUD CREEK
Built 2019
Bridge Details
- Structure #
- 000000013900590
- Year Built
- 1961
- Length
- 104.9 m (344.2 ft)
- Max Span
- 45.7 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 10,300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,344,000
- Total Project Cost
- $2,016,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.