GAINES FERRY RD over NOR SOUTHERN RAILROAD

2 MI SW OF FLOWERY BR · County 139, Georgia · Built 1988 · 2 Lanes · 5,369 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000013950600
Year Built
1988
Length
50.3 m (165 ft)
Max Span
16.8 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
5,369
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$645,000
Total Project Cost
$967,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.