I-985 SBL (US 23) over S-2920 SPOUT SPRINGS RD

0.7 MI SE OF FLOWERY BR · County 139, Georgia · Built 1968 · 2 Lanes · 25,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000013900440
Year Built
1968
Length
44.8 m (147 ft)
Max Span
21 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
25,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$574,000
Total Project Cost
$862,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.