I-985 NBL (US 23) over S-2920 SPOUT SPRINGS RD
0.7 MI SE OF FLOWERY BR · County 139, Georgia · Built 1968 · 2 Lanes · 68,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
34.178758, -83.914206
This bridge is in worse condition than 79.6% of bridges in County 139. The average bridge in Georgia is 0 years old; this one is 58 years old.
Nearby Bridges
I-985 SBL (US 23) over S-2920 SPOUT SPRINGS RD
Built 1968
MULBERRY STREET over FLOWERY BRANCH
Built 1985
ATLANTA HIGHWAY over FLOWERY BRANCH
Built 1931
ATLANTA HIGHWAY over SR 419 (I-985 US 23)
Built 1968
WADE ORR ROAD over SR 419 (I-985 US 23)
Built 1968
McEVER RD over FLOWERY BRANCH (LAKE)
Built 1961
I-985 EXIT RAMP B over MUD CREEK
Built 2019
HF REED IND. PKWY over I-985 (US 23) STREAM 15
Built 2019
HF REED INDUSTRIAL over NORFOLK SOUTHERN
Built 2001
I-985 EXIT RAMP C over MUD CREEK
Built 2019
Bridge Details
- Structure #
- 000000013900430
- Year Built
- 1968
- Length
- 40.8 m (133.9 ft)
- Max Span
- 20.7 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 68,300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $524,000
- Total Project Cost
- $785,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.