SR 53 over NOR SOUTHERN RAILROAD

IN OAKWOOD · County 139, Georgia · Built 1969 · 4 Lanes · 35,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000013900230
Year Built
1969
Reconstructed
1994
Length
54.3 m (178.1 ft)
Max Span
19.5 m
Width
27.8 m (91.2 ft)
Lanes
4
Daily Traffic
35,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,075,000
Total Project Cost
$1,612,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.