I-285 over M-9252 GLENRIDGE DRIVE
IN N FULTON · County 121, Georgia · Built 2023 · 12 Lanes · 235,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.910214, -84.361739
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 3 years old.
Nearby Bridges
INTERSTATE 285 over GLENRIDGE DRIVE
Built 2021
INTERSTATE 285 over GLENRIDGE DRIVE
Built 2020
INTERSTATE 285 over GLENRIDGE DRIVE
Built 2020
INTERSTATE 285 over 400SB TO 285 WB
Built 2021
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
JOHNSON FERRY RD over SR 400 + 2 SR 400 RAMPS
Built 1993
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
US 19 SBL SR 400 over I 285
Built 2022
US 19 SBL SR 400 over I 285
Built 2022
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
Bridge Details
- Structure #
- 000000012154330
- Year Built
- 2023
- Length
- 38.1 m (125 ft)
- Max Span
- 24 m
- Width
- 52.2 m (171.3 ft)
- Lanes
- 12
- Daily Traffic
- 235,000
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,100,000
- Total Project Cost
- $16,650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.