INTERSTATE 285 over 400SB TO 285 WB

IN S. SANDY SPRINGS · County 121, Georgia · Built 2021 · 1 Lanes · 24,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012154070
Year Built
2021
Length
76.2 m (250 ft)
Max Span
38.1 m
Width
11.2 m (36.7 ft)
Lanes
1
Daily Traffic
24,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.