US 19 SBL SR 400 over I 285

SR 400 SOUTH · County 121, Georgia · Built 2022 · 3 Lanes · 6,805 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012154210
Year Built
2022
Length
17.1 m (56.1 ft)
Max Span
17.1 m
Width
12.5 m (41 ft)
Lanes
3
Daily Traffic
6,805
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,958,000
Total Project Cost
$7,437,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.