I-285 over SR 400/US 19
IN N FULTON · County 121, Georgia · Built 2023 · 9 Lanes · 216,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.911831, -84.356681
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 3 years old.
Nearby Bridges
INTERSTATE 285 over GA 400
Built 2021
INTERSTATE 285 over GA 400
Built 2021
SR 400 RAMP over SR400 I-285
Built 2020
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
285 TO 400N over I-285
Built 2022
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
I-285 CCB TO SR 40 over SR 400 NBL (US19)
Built 2022
INTERSTATE 285 over GA400RAMP/PTREE DNWDY RD
Built 2021
US 19 SBL SR 400 over I 285
Built 2022
Bridge Details
- Structure #
- 000000012154340
- Year Built
- 2023
- Length
- 78.6 m (257.9 ft)
- Max Span
- 30.5 m
- Width
- 48.5 m (159.1 ft)
- Lanes
- 9
- Daily Traffic
- 216,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $22,940,000
- Total Project Cost
- $34,410,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.