INTERSTATE 285 over GA400RAMP/PTREE DNWDY RD

IN S. SANDY SPRINGS · County 121, Georgia · Built 2021 · 1 Lanes · 9,710 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012154040
Year Built
2021
Length
362.4 m (1189 ft)
Max Span
35.8 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
9,710
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$105,598,000
Total Project Cost
$158,397,000