US 19 SBL SR 400 over I-285 (SR 407)
JCT 1-285 & SR 400 · County 121, Georgia · Built 2022 · 3 Lanes · 23,300 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.911442, -84.357506
This bridge is in worse condition than 13.4% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 4 years old.
Nearby Bridges
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
INTERSTATE 285 over GA 400
Built 2021
285 TO 400N over I-285
Built 2022
I-285 over SR 400/US 19
Built 2023
INTERSTATE 285 over GA 400
Built 2021
SR 400 RAMP over SR400 I-285
Built 2020
US 19 SBL SR 400 over I 285
Built 2022
INTERSTATE 285 over 400SB TO 285 WB
Built 2021
US 19 SBL SR 400 over I 285
Built 2022
Bridge Details
- Structure #
- 000000012154200
- Year Built
- 2022
- Length
- 27.3 m (89.6 ft)
- Max Span
- 27.3 m
- Width
- 22.3 m (73.2 ft)
- Lanes
- 3
- Daily Traffic
- 23,300
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.