US 19 SBL SR 400 over I 285

SR 400 SOUTH · County 121, Georgia · Built 2022 · 2 Lanes · 23,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012154220
Year Built
2022
Length
17.1 m (56.1 ft)
Max Span
17.1 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
23,300
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,958,000
Total Project Cost
$7,437,000