I-285 CCB TO SR 40 over SR 400 NBL (US19)
IN N FULTON · County 121, Georgia · Built 2022 · 1 Lanes · 9,940 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.913669, -84.356583
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 4 years old.
Nearby Bridges
SR 400 RAMP over SR400 I-285
Built 2020
INTERSTATE 285 over GA 400
Built 2021
I-285 over SR 400/US 19
Built 2023
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
INTERSTATE 285 over GA 400
Built 2021
INTERSTATE 285 over GA400RAMP/PTREE DNWDY RD
Built 2021
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
285 TO 400N over I-285
Built 2022
400NB TO 285EB over PTREE DUNWOODY RD
Built 2021
Bridge Details
- Structure #
- 000000012154120
- Year Built
- 2022
- Length
- 224.3 m (735.9 ft)
- Max Span
- 32.9 m
- Width
- 11.9 m (39 ft)
- Lanes
- 1
- Daily Traffic
- 9,940
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A