I-285 CCB TO SR 40 over SR 400 NBL (US19)

IN N FULTON · County 121, Georgia · Built 2022 · 1 Lanes · 9,940 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012154120
Year Built
2022
Length
224.3 m (735.9 ft)
Max Span
32.9 m
Width
11.9 m (39 ft)
Lanes
1
Daily Traffic
9,940
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.