INTERSTATE 285 over GLENRIDGE DRIVE

IN S. SANDY SPRINGS · County 121, Georgia · Built 2021 · 2 Lanes · 30,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012154100
Year Built
2021
Length
60 m (196.9 ft)
Max Span
41.8 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
30,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,136,000
Total Project Cost
$18,204,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.