JOHNSON FERRY RD over SR 400 + 2 SR 400 RAMPS
IN N FULTON · County 121, Georgia · Built 1993 · 6 Lanes · 24,100 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.907061, -84.361475
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 33 years old.
Nearby Bridges
INTERSTATE 285 over GLENRIDGE DRIVE
Built 2021
I-285 over M-9252 GLENRIDGE DRIVE
Built 2023
INTERSTATE 285 over GLENRIDGE DRIVE
Built 2020
INTERSTATE 285 over GLENRIDGE DRIVE
Built 2020
US 19 SBL SR 400 over I 285
Built 2022
US 19 SBL SR 400 over I 285
Built 2022
INTERSTATE 285 over 400SB TO 285 WB
Built 2021
GLENRIDGE PWY over SR 400 + 2 SR 400 RAMPS
Built 1993
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
US 19 SBL SR 400 over I-285 (SR 407)
Built 2022
Bridge Details
- Structure #
- 000000012107540
- Year Built
- 1993
- Length
- 150.6 m (494.1 ft)
- Max Span
- 39 m
- Width
- 23.9 m (78.4 ft)
- Lanes
- 6
- Daily Traffic
- 24,100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,036,000
- Total Project Cost
- $6,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.