I-75R NB TO CENTRA over I-75- I-75 RMP- 2 M-RTS
IN ATLANTA · County 121, Georgia · Built 1988 · 2 Lanes · 6,805 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.737608, -84.392367
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 38 years old.
Nearby Bridges
I-75 over M-9053 GEORGIA AVE.
Built 1987
I-75R NB TO FULTON over M-9053 GEORGIA AVE.
Built 1988
I-75 RMP TO FULTON over I-75 RMP SB FROM I-20N&S
Built 1988
FULTON STREET over I-75-3 I-75R-1 MRT-1 CS
Built 1988
FULTON STREET over M-9164 CENTRAL AVE.
Built 1988
I-75 N RM TO FULTO over I-75 NB RMP TO I-20 E&WB
Built 1988
I-75 RMP N TO M916 over I-75- I-75R- I-20R-M9163
Built 1988
I-20 RMP EB TO I-7 over I-75-3I-75R-I-20R-3MRT-2
Built 1988
WASHINGTON STREET over 2 I-75 RAMPS
Built 1959
I-20 RMP E TO I-75 over M-9163- M-9164- M-9166
Built 1987
Bridge Details
- Structure #
- 000000012106680
- Year Built
- 1988
- Length
- 220.4 m (723.1 ft)
- Max Span
- 60.4 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 6,805
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,825,000
- Total Project Cost
- $4,237,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.