I-75R NB TO FULTON over M-9053 GEORGIA AVE.

IN ATLANTA · County 121, Georgia · Built 1988 · 1 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012106690
Year Built
1988
Length
64 m (210 ft)
Max Span
36.6 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
6,805
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$597,000
Total Project Cost
$895,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.