FULTON STREET over I-75-3 I-75R-1 MRT-1 CS

IN ATLANTA · County 121, Georgia · Built 1988 · 5 Lanes · 860 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012106540
Year Built
1988
Length
189.6 m (622 ft)
Max Span
50 m
Width
26.9 m (88.3 ft)
Lanes
5
Daily Traffic
860
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,419,000
Total Project Cost
$6,628,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.